Bakery Production Facility Construction Project: H-E-B | 91桃色

91桃色

We use cookies to enhance your experience, analyze site usage, and support our marketing efforts. By clicking 'Accept All,' you agree to the storing of cookies on your device. You can customize your preferences or opt out of non-essential cookies at any time.

Preferences
Projects

H-E-B

Location
San Antonio, Texas
Project Size
24,000 SF
Completion Year
2012
HEB 91桃色 03
HEB 91桃色 01
HEB 91桃色 04
HEB 91桃色 02

Steam Plant Project Scope
91桃色 built a 4,000 sf steam plant for H-E-B adjacent to its existing manufacturing operation. The facility houses three boilers and the necessary water softening, deaerating and chemical treatment systems to service the manufacturing facility. 91桃色 also installed a steam generator to supply sterile steam to H-E-B aseptic process. Additionally, 91桃色 replaced the bakery Spiral Freezer, and remodeled the refrigeration of the existing 20,000 sf bakery to include a Glycol & Chilled Water System for H-E-B.

Sprial Freezer Installation Project Scope
91桃色 replaced H-E-B frozen dough spiral freezer with a new 12,000 pounds per hour spiral freezer. The existing egg and yeast coolers, case packaging mezzanine and holding freezer were also completely remodeled. A new 3,900 sf refrigeration machine room, including five new ammonia compressors, to support the new spiral freezer was also constructed.

Glycol & Chilled Water System Project Scope
91桃色 upgraded the chilled ingredient water system by replacing the existing falling film chiller and header piping to H-E-B frozen dough mixers. 91桃色 also installed a new ammonia glycol heat exchanger chiller package to provide a jacketed cooling system to various mixers. A new controls system was also part of this project.